Surveying and setting out
We set out the grid, check levels and position the building on the plot.
Setting out, excavation, rebar, concrete pile caps and industrial floors. In winter, admixtures and concrete heating.
We run the whole project, from setting out to signed certificates. Nothing is subcontracted without your consent.
We set out the grid, check levels and position the building on the plot.
Excavation, grading, compaction, backfill. Our own machinery.
Rebar cages to the design, with cover and spacing checked.
Concrete pile caps, rafts, pad and piled foundations.
A reinforced slab with a hardened top, rated for load.
Damp-proof course and coating where the ground and water table require it.
Lead times are for a standard building. The exact programme is fixed in the contract after the survey.
We look at the ground, water table and access
Type of base, scope of work and cost
Excavation, hauling, compaction
Tying rebar, formwork, embedded plates
Concreting and curing
Geometry, levels, hidden-works certificates
This is what the estimate looks like: half the site questions are settled before the contract.
A mistake in the ground costs more than anything else. So we start with setting out, look at the soil and water table, and only then choose the foundation.
Our own plant: excavator, tippers, compactors. Soil haulage and backfill are separate lines in the estimate, no surprises.
Anti-freeze admixtures, heating and strength monitoring. The programme grows honestly — and we say so in advance.
If your question is not here, write to us and we will answer for your project.
About 14 days before it takes the frame, full strength at 28 days. We often start erecting earlier by calculation.
We size piles or a raft, sometimes replace and compact the soil. The choice follows the ground survey, not guesswork.
Yes, with anti-freeze admixtures and heating. We extend the programme honestly and put it in the contract.
Give us the size and region — we work out area, lead time and a quote.
Enter the dimensions — we work out area and an indicative lead time at once. The quote follows a short call.