Repair shop with an overhead crane
An equipment repair shop with crane runways.
- Dimensions
- 18 × 48 m
- Area
- 864 m²
- Duration
- 10 weeks
- Year
- 2025
- Client
- AGMK
A repair shop for large assemblies: it needed an overhead crane, floors strengthened for equipment loads and good task lighting. Part of the work ran next to live production.
What we did
-
Design around the process
We laid the equipment out on plan and sized the frame around the crane routes.
-
Crane runways
Beams and columns rated for 10 tonnes, rails levelled by instrument.
-
Floors
A reinforced slab with a hardened top and embeds for machine tools.
-
Utilities
Sleeves for power and compressed air are laid before the floor is poured.
-
Lighting
Industrial luminaires over the working zones and rooflights in the roof.
Project specifics
The workshop was designed around the equipment: first the machine layout and crane routes, then the frame. Embeds and compressed-air sleeves went in before the floor was poured — redoing it later costs twice as much.
The project during works and after handover
Similar projects
Shall we discuss your project?
Tell us the task and the size — we will price it and come to measure.