What we build
Six areas of work

What we build

Six areas of work and the full cycle: design, estimate, erection and handover by one contractor.

01

Steel-frame hangars and warehouses

A hot-rolled or light-gauge steel frame, sandwich-panel cladding, doors, rainwater system and load-rated floors. Steel is calculated from the design, not by eye.

Clear span
12–24 m
Cladding
sandwich 50–150 mm
Turnkey lead time
from 5 weeks
More about the service →
How we work

The same on every kind of work

Survey, design, staged estimate, a fixed-price contract and a programme.

  1. Request

    A call or Telegram. We clarify the task and the site.

    15 MINUTES
  2. Site visit and survey

    An engineer on site: ground, access, connection points.

    1–2 DAYS
  3. Design and estimate

    Drawings, steel schedule and a stage-by-stage estimate.

    3–5 DAYS
  4. Contract

    A fixed price, a works programme and each side's liability.

    1 DAY
  5. Erection

    Foundation, frame, cladding. A photo report week by week.

    4–8 WEEKS
  6. Handover and warranty

    Certificates, as-built documents and warranty obligations.

    WARRANTY UNDER CONTRACT
Examples

What we have built

All projects

Shall we discuss your project?

Give us the size and region — we work out area, lead time and a quote.

+998 99 925 06 86
Call Telegram