erection crew
Our crews are on staff, not hired by the day. We answer for the welding and erection.
We build hangars, warehouses, workshops and modular buildings in Tashkent and across Uzbekistan. We own the whole project, from setting out to signed certificates.
We build things that work every day: warehouses, workshops and depots. So we speak in numbers — contract dates, scope, warranty.
Contract, invoice and certificates — issued to your company.
We send company details the same day you ask.
Our crews are on staff, not hired by the day. We answer for the welding and erection.
Crane, forklift and earthmoving plant are ours, on site. No waiting on a contractor and no paying for their downtime.
A dated programme. Any delay through our fault is our liability.
Experience with Uzneftegaz and AGMK. Tender and health-and-safety document packs are prepared on request.
The same for a five-week warehouse and a three-month workshop — only the stage durations change.
A call or Telegram. We clarify the task and the site.
15 MINUTESAn engineer on site: ground, access, connection points.
1–2 DAYSDrawings, steel schedule and a stage-by-stage estimate.
3–5 DAYSA fixed price, a works programme and each side's liability.
1 DAYFoundation, frame, cladding. A photo report week by week.
4–8 WEEKSCertificates, as-built documents and warranty obligations.
WARRANTY UNDER CONTRACTOur own machinery and in-house crews: we never wait on a subcontractor or miss dates because of someone else.
The plant is ours: no waiting on a contractor and no slipping dates because of someone else. Plant papers and permits are shown on site.
We answer your questions, come to measure and price it by stages.
Enter the dimensions — we work out area and an indicative lead time at once. The quote follows a short call.