A yard for machinery and fencing for the depot
An asphalt yard, perimeter and lighting.
- Dimensions
- 4,300 m²
- Area
- asphalt
- Duration
- 5 weeks
- Year
- 2023
The depot grounds: broken drives, no turning area for vehicles, a perimeter with no fence or lighting.
What we did
-
Surveying
We took the falls and set out drainage and vehicle routes.
-
Base
Excavation and crushed stone compacted in layers.
-
Surface
Asphalt on drives and parking, concrete under heavy vehicles.
-
Perimeter
Fencing with sliding gates and wickets.
-
Lighting and markings
Lighting columns around the perimeter, marked bays and directions.
What solved the problem
Drainage was the key: before the works water stood on the drives and broke up the surface. We reset the falls, added channels and laid concrete instead of asphalt under heavy vehicles.
The project during works and after handover
Similar projects
Repair shop with an overhead crane
A distribution warehouse near Tashkent
Shall we discuss your project?
Tell us the task and the size — we will price it and come to measure.